Industrial
Cardinal Health Distribution CenterDetroit, MI
On this award winning brownfield project, Blaze self-performed the site demolition, site remediation, mass excavation, contaminated soil removal, grading, site utility installations, and site preparation for all the hard surfaces. This new medical storage and distribution facility is the anchor of the $500M expansion of Henry Ford Health System.
Magna InternationalDelta Township, MI
DTE/UniRoyalVarious
Blaze self-performed the Phase One major site remediation and cleanup of the old UniRoyal Tire manufacturing site along the Detroit River. Work scope included a 45ft excavation and removal of all contaminates along the river’s edge. Blaze exported 850,000 tons of contaminated soils and backfilled with 850,000 tons of engineered fill.