Beaumont HospitalVarious
Blaze performed site demolition, mass excavation, and site utility relocation and installations at the Grosse Pointe, Royal Oak, and Commerce Township hospital sites. Blaze installed a 160,000 cubic feet underground precast water detention system at the Royal Oak campus. Blaze is currently involved in the Proton Facility and EC Expansion. Blaze has held a blanket contract directly with Beaumont since the early 2000's.
Detroit Medical Center HospitalDetroit, MI
Contract work performed by Blaze included site demolition, mass excavation, site utility installations and relocations at the DMC Children's Hospital, DMC Sinai Grace, DMC Harper-Hutzel, and DMC Cardiovascular Hospital sites. Blaze completed the foundation excavation/backfill at the Cardiovascular site and the concrete pavement parking lot at the Children’s Hospital site.