City CenterLas Vegas, NV

Blaze self-performed the relocation of the underground utilities around the Monte Carlo Hotel as well as the excavation, backfill, grading, and aggregate installations for the new Fire Station as a part of the $9B MGM City Center on the strip in Las Vegas, Nevada.

"Z" DeckDetroit, MI

Blaze self-performed the pavement removal, contaminated soil disposal, mass excavation, site preparation, and surgical excavation and backfill for the footings and foundations for the "Z" Deck Parking Facility in Downtown.

Allied Commerce CenterLivonia, MI

Blaze self-performed site demolition, mass excavation, grading, and site utilities that included (8) underground CMP storm water detention systems for the 750,000 square foot Industrial Park.

IKEACanton, MI

Blaze self-performed mass excavation and utility work that included a 42” underground CMP storm drainage detention system for the addition of the IKEA Retail Home Furnishings center in Canton.

Michigan Motion PicturesPontiac, MI

Blaze self-performed the heavy civil demolition of the old General Motors Truck & Bus Facility in Pontiac, MI. This work included the breaking and removal of existing deep reinforced concrete foundations, asphalt, curb, and concrete pavement. Blaze self performed the mass excavation, grading, foundation excavation/backfill, building pad sub-base installation, aggregate installation for hard surfaces and the storm, sanitary sewer, and water main utilities.

The Scott BuildingDetroit, MI

Blaze self-performed the mass excavation, earth retention, contaminated soil disposal, and the site utilities for the new $70M mixed use development in Brush Park.

Kresge FoundationTroy, MI

Blaze self-performed the parking lot renovations and building pad preparation for the expansion of the the Kresge Foundation. Work included asphalt, curbs, and pavement removals, mass excavation and backfill, aggregate installation, and utility installations.